Management control
CHU Marrakech — Hospital management control
Documentary study of management control at CHU Mohammed VI: governance, budgets, costs and hospital indicators.
Academic team project
All projects
- Project type
- Academic
- Documented period
- 2025–2026
- Team
- Team of 4
Overview
An academic 2025–2026 case study examining how public accountability and medical-economic performance interact at CHU Mohammed VI in Marrakech.
Contribution and project context
Academic team project. The documents do not identify individual task allocation.
Approach
Documentary research
Review of the 2022 activity report and literature on hospital management control.
Control-system diagnosis
Examination of governance, the budget cycle, responsibility centres and price-volume-mix variances.
Work and deliverables
Hospital indicators
Interpretation of occupancy, average length of stay, bed turnover and activity volumes. These describe 2022 activity, not results achieved by the team.
Accounting and information
Discussion of retrospective reporting limits and the relationship between public and management accounting.
Findings and recommendations
The report recommends strengthening the control function, internal agreements by responsibility centre and integrated information systems. ABC/ABM is proposed as a costing improvement.
Tools and skills
Management control · Budget analysis · KPI · ABC / ABM
Visual evidence from source materials
Scope and limitations
Document-based academic analysis. No on-site audit, access to patient files or measured operational effect is claimed.
Verified sources
Rapport CHU Marrakech_CDG .pdf
More to explore
LabelVie — Strategic diagnosis
Academic diagnosis of Carrefour Market: segmentation, PESTEL, Porter, value chain and strategic recommendations.
Academic team project
Excel & VBA — Stock management
Goods, stock entries, exits and inventories with stock indicators and VBA procedures.
Academic team project

